Budget/Schedule

Budget

The total cost of project was $343.25 for the 13 parts that were planned to use. The budget is under control because some materials were got from machine shop, wood machine or borrow from others. However, some parts were wasted due to change of design and change of materials. The project will only use one 2L004 motor to move the panel in vertical direction instead of two motors, and the wood beams were used to replace steel beams since they were strong enough and lighter than steel beams.

Budget Total

Parts Details

Schedule

The project was managed as table on the left shown. In November and December, the proposal and project was followed the schedule to finish all the drawings. The material was ordered in January, and started to work on the materials in the lab and finished all the parts at the end of March.

​

To make sure the parts can be installed together, the SolidWorks assembly was used to show to motions and relations between different parts. 

​

Moreover, the construction of project was finished installing at the end of March and so changed was made in early April.

​

bottom of page